Sunday, June 30, 2024

Worked on Seascape 2. There will probably be one more session of building the sky, boat, and water in a basic way followed by one or two sessions of sky, boat, and water details.

Saturday, June 29, 2024 a

Worked on the bottle, glass, apples, and table of Still Life 17.

I need to go through each still-life painting again and then some details to finish them. Some only need details. The ones with the shadows from blinds need more work. I’ll be happy to finish these 13 still-life paintings. I’m anxious to begin new paintings.